Case Studies

Example engagements showing problem, solution, and measurable outcomes.

Industrial IO Controller Bring-up Recovery

Problem

Prototype boards booted intermittently and failed under relay switching transients in field-like conditions.

Solution

Power sequencing analysis, decoupling redesign, and firmware startup order changes with oscilloscope-guided validation.

Outcome

Stable boots across temperature range and 0 bring-up failures across the next 30 units.

“Clear debug process and practical fixes we could productionize quickly.”

Battery IoT Node Runtime Extension

Problem

Node battery life was ~3 weeks, below target of 3 months.

Solution

Current profiling, rail-domain gating strategy, duty-cycle optimization, and low-leakage BOM replacements.

Outcome

Measured runtime increased to 14+ weeks on the same cell chemistry.

“The redesign paid for itself in one pilot batch.”

EMC Pre-Compliance Risk Reduction

Problem

Pre-scan failed in two bands due to converter harmonics and cable emissions.

Solution

Layout return-path corrections, filter retuning, and harness/common-mode mitigation before formal testing.

Outcome

Pre-scan margins improved enough to proceed confidently to certification test booking.

“Fast, targeted changes with measurable EMC impact.”